Goals lets your organization define targets, follow them over a period and, if you want, include them in performance evaluations. Everything is organized in cycles with common rules for the participating collaborators.
This guide takes you from scratch until your first cycle is running. Open each section to see what to do and which article to go to for details.
-
Goals works with cycles: follow-up periods for the whole company. It is worth deciding these things before creating the first one.
Topic What to define Where it is set up Cycles Which period each cycle covers (for example, yearly or quarterly) and its start and end dates. Goals → New cycle Participants Who takes part. By default, the whole community. Assignment step of the cycle Features Whether you limit the number of goals or the maximum progress, and whether you use custom formulas, progress control or key results (OKRs). Features step of the cycle Measurement How progress is measured: percentage, binary, numeric or monetary. When creating each goal Approval Whether goals need the leader's approval to take effect. Goals → Settings → Approval flow Who edits Which roles can create, edit and delete goals. Goals → Settings → Edit control Weights How much each of a collaborator's goals weighs. They must add up to 100%. Edit weight and approve Evaluation Whether goals will be rated within a performance evaluation. Performance template -
Turn on the Goals card in Apps so collaborators can create their goals and follow them up.
-
In the Settings tab of Goals you define the rules that apply to the whole community: whether goals require the leader's approval, who can edit them and whether you use custom formulas to calculate the score.
With the approval flow turned on, goals must be approved by the leader to take effect. If you turn it off, the leader and the collaborator can edit them freely. Administrators can always edit them.
-
The cycle is created with a four-step wizard: Basic information, Assignment, Features and Validation. In Features you choose whether to turn on goal limit, maximum progress limit, custom formulas, progress control and key results.
With the cycle active, only the goal limit and progress control can be modified. The rest of the features cannot be changed.
-
Goals can be created by collaborators themselves from app.humand.co or the Humand app, by their leaders from My team, or by you from the administrator, one by one or with a spreadsheet.
-
Each of a collaborator's goals can have a weight, and the weights must add up to 100%. If goals are included in a performance evaluation, the weights influence the final score. If you use approval, the leader approves the goals when saving the weights.
-
From the administrator you see how each cycle is progressing: each collaborator with their manager, number of goals, progress and last update. You can also download reports.
-
You can include goals in performance evaluations. When creating the evaluation cycle you choose which goal cycle is evaluated, and reviewers see and rate each goal.
-
Keep these points in mind when setting up the module.
- If the approval flow is turned on, the goal stays in Draft status until the leader approves it.
- The weights of already approved goals cannot be edited.
- If you do not edit the weights, they are split equally. If you edit them and a new goal is created afterwards, that goal is created with 0% weight.
- Each goal's dates must be within the cycle's dates.
- Each goal can have up to 40 responsible people.
- With Progress control turned on, only leaders and administrators can update progress.
- A goal's title allows up to 255 characters in app.humand.co and up to 80 in the Humand app.